# How to automate design requests in Uranus OS
Keep design requests in Uranus OS with format, due date and every version on the same card, and an agent that checks each request before it reaches design.

Design requests arrive by WhatsApp, by email, in the hallway. "I need a banner for the trade show." What size? By when? With what copy? The designer asks, waits for the answer, makes the piece, sends the first version by message. The second version goes through a different channel. When the same request comes back a month later, nobody can find the approved file.

Design does not stall for lack of talent. It stalls because requests arrive incomplete and versions end up scattered across messages.

## The stages

The design team runs this, taking requests from the rest of the company. Each request goes through:

- Request
- Production
- Review
- Delivered

## How to set it up in Uranus OS

1. **Create a "Design" project type** with these four stages. Every design request becomes a task in this project, wherever it came from.
2. **Define the task form.** The fields that matter are **Format** (post, banner, flyer, deck, with dimensions) and **Due date**. Add the copy, who asked, where the piece will be used, and references. Because the form depends on the task type, a banner request can ask for size and print material, and a post request can ask for the channel.
3. **Assign owners per stage.** The requester owns Request and Review. The designer owns Production. If the design team has more than one person, use a group and leave the hand-off to the next stage.
4. **Write the request procedure.** A short document listing what every request must include and the minimum lead time the team agreed for each format. It lives in the project folder and serves as the reference for people and for the agent.

Each version of the piece goes up as an attachment on the same card, with a comment saying what changed. The approved version sits where everyone looks for it.

## Where the agent comes in

The agent keeps requests and versions in one place, so nobody digs through messages. When a request comes in, it checks whether the form is complete. If something is missing, it asks the requester before the request reaches design.

An example instruction:

> When a new request enters Request, check that it has format, dimensions, copy and due date, following the request procedure. If anything is missing, comment on the task asking the requester. If it is complete, propose assigning it to the designer with the fewest tasks In progress and moving it to Production. When a new version is attached, propose moving it to Review.

To do that it calls `tasks_get` to read the request, `tasks_search` to see each designer's workload, `tasks_assign` to assign it and `tasks_transition` to move the card between Production and Review. The agent does not approve the piece. The requester reviews and approves it.

By default the agent proposes and a person clicks Approve or Reject. Each agent only reaches what you allow it in the system.

If you connect Figma or Google Workspace, the working file link sits next to the card.

## What gets recorded

The history logs every change with a name and a date. Who asked, when, which designer picked it up, how many versions it took to get approved, and who approved it. Agent actions carry an "agent" badge. When someone asks for the same piece again, the old card holds the approved file and copy.

## With the AI you already use

If your company already uses ChatGPT, Claude, Gemini or another AI, you can connect it to the Uranus OS MCP server. Anyone who needs a piece opens the request from their own AI, which fills in the form and creates the task, with the same permissions and the same history.

If you prefer, Uranus can set this up with your team during onboarding.

[Join the closed beta](/contact?servico=teste)
