# How to automate the weekly schedule in Uranus OS
Set up the weekly schedule in Uranus OS: machine and hours on every order, an agent that proposes the plan and flags conflicts, and a planner who decides.

The planner builds the week in a spreadsheet on Friday afternoon. On Monday a rush order arrives over WhatsApp, the file becomes "schedule v3 final", and the shop floor works from the printed copy, which is already out of date. Two orders land on the same machine on the same day. Nobody notices until the operator does.

The schedule exists. The trouble is that it changes all the time and only one person knows which version is the real one.

## The stages

Planning runs it, with production confirming the adjustments. There are four stages:

- Orders
- Capacity
- Schedule
- Adjustment

## How to set it up in Uranus OS

1. **Create a "Weekly schedule" project type** with those stages. Each week can be a project, and each order to schedule a task with its own key, such as OS-405.
2. **Build the order form.** The two fields that drive the schedule: machine and estimated hours. Next to them, the obvious ones: source order, customer due date, scheduled day and priority.
3. **Set the owner of each stage.** Orders, capacity and schedule belong to the planner. Adjustment belongs to the production lead, who confirms on the floor what changed.
4. **Write capacity down in Documents.** A procedure with the hours each machine has available per day and your house rules, such as which machine can stand in for which. Every version keeps who wrote it, so when capacity changes, the change is on record.

An order waiting for material or a drawing goes to Blocked, and the card shows why.

## Where the agent comes in

The agent spreads the orders across capacity and highlights conflicts. It reads the orders in Orders, adds up the hours per machine and per day, and compares them with the capacity you wrote down. Then it proposes a day and a machine for each order and moves the ones that fit to Schedule.

Whatever does not fit becomes a conflict: a machine booked beyond its capacity, an order whose due date falls before its scheduled day, two rush orders fighting over the same machine. The agent does not settle these on its own. It posts a project update with the list, and the planner decides.

Worth saying plainly: the agent works with the hours on the cards. It does not read the machine. If the number on a card is wrong, the math will be too.

The instruction you write:

> Whenever I ask, read the orders in Orders. Use each machine's hours from the capacity document. Propose a day and a machine for every order, respecting due date and priority, and move the ones that fit to Schedule. List the conflicts in a project update, with the order, the machine and the reason. Do not change due dates or priorities.

The tools it calls: `tasks_search` to find the orders, `tasks_get` to read hours and due dates, `tasks_transition` to change the stage and `project_updates_publish` for the conflict list.

By default, the agent proposes and a person clicks Approve or Decline. It reaches only what you allow it in the system.

## What gets recorded

Every change to the schedule goes into the history with a name and a date. When an order moves to another day or machine, you can see who moved it, whether it was the agent or a person, and who approved it. The agent's actions carry the "agent" badge. The following Friday, the planner sees what was planned and what changed during the week, without comparing spreadsheet versions.

## With the AI you already use

If your company already uses ChatGPT, Claude, Gemini or another assistant, you can connect it to Uranus OS through the MCP server. The planner asks what is scheduled on the press for Wednesday, or what happens if a rush order comes in, and works on the same cards with the same permissions.

If you prefer, Uranus can do the rollout with your team.