Skip to content
Back to blogUse cases

How to automate your post calendar in Uranus OS

By Gustavo Bertoi··3 min read

Set up your post calendar in Uranus OS with stages, channel, date and owner, and let an agent flag any post that nears its date without a review.


The post calendar usually lives in a spreadsheet. One tab per month, one row per post, a status column someone forgets to update. The copy sits in a doc, the artwork in a Drive folder, the approval in a WhatsApp thread. By Thursday, nobody knows whether Friday's post was reviewed, or who was supposed to review it.

The problem is not a missing tool. The stage, the deadline and the owner of each post are scattered across places that never talk to each other.

The stages

The marketing team runs this. Each post goes through:

  • Topic
  • Copy
  • Review
  • Scheduled
  • Published

How to set it up in Uranus OS

  1. Create a "Post calendar" project type with these five stages. In Uranus OS every project type has the stages your company defines, so each post's card moves through Topic, Copy, Review, Scheduled and Published.
  2. Define the task form. The fields that matter here are Channel (Instagram, LinkedIn, blog, newsletter), publishing Date and Owner. Add the artwork link and the final copy too, so everything about the post sits on one card.
  3. Assign owners per stage. Whoever writes owns Copy, whoever reviews owns Review, whoever puts the post on the network owns Scheduled. Use roles and groups so nothing hangs on a single name.
  4. Write the procedure. A short document, kept next to the tasks, covering tone of voice, what counts as reviewed, and how far ahead of the date the copy has to be ready.

Each post becomes a task with its own key, such as OS-142, with comments, attachments and subtasks. The artwork goes in as an attachment; a requested change goes in as a comment.

Where the agent comes in

The agent does two things. It shows the whole month, with posts grouped by date and stage. And it warns you when a post is close to its date and still has not been reviewed.

You write its instruction in plain language:

Whenever I ask, list this month's posts by date, with channel, stage and owner. If any post is due in the next three days and is still in Topic or Copy, comment on the task tagging the owner and show me the list. Do not move any card without approval.

To do that it calls tasks_search to find the month's posts, tasks_get to read channel, date and owner, and project_updates_publish to post the monthly summary to the project. If a post needs a different reviewer, it proposes tasks_assign. Once the copy is approved, it proposes tasks_transition to Scheduled.

By default the agent proposes and a person clicks Approve or Reject. And each agent only reaches what you allow it in the system: if it can only see the calendar project, it sees nothing else.

One thing to be clear about. Uranus OS does not publish or schedule posts on social networks. The Scheduled stage records that someone scheduled the post in the network's own tool. What the OS makes sure of is that everyone knows where each post stands.

What gets recorded

Every change goes into the history with a name and a date. Who moved the post to Review, who approved the copy, when the artwork was swapped. Agent actions carry an "agent" badge, so you can tell what the agent proposed from what a person decided. If a post goes out with a mistake, "who reviewed this?" has an answer.

With the AI you already use

If your company already uses ChatGPT, Claude, Gemini or another AI, you can connect it to the Uranus OS MCP server and run the calendar from there. Ask what goes out this week, pull the list of unreviewed posts, move a card. The same permissions apply, and the same history records everything.

If you prefer, Uranus can set this calendar up with your team during onboarding.

Join the closed beta

Set up this process in Uranus OS

30-day trial. Then $100 a month, with no per-user fee.

Join the closed beta