The order leaves sales as a PDF, becomes a row in a spreadsheet and then takes on a life of its own in the plant's WhatsApp group. Someone asks whether it has left cutting yet. The supervisor answers from memory, or not at all. The spreadsheet says assembly, but assembly says the parts never arrived. When the customer calls, nobody knows which stage the order is at or who has it.
Effort is not what's missing. A single place is. The information lives in three, and none of them shows the whole order.
The stages
Production runs it. The order moves through five stages:
- Scheduled
- Cutting
- Assembly
- Check
- Shipping
Each stage has an owner and a machine. What matters is knowing, at any moment, where every order is and who has it.
How to set it up in Uranus OS
- Create a "Production order" project type with those five stages. The stages are yours: if your plant paints between assembly and check, add it.
- Build the task form. Each order becomes a task with its own key, such as OS-142. The form holds the fields production looks at every day: machine, owner and due date. Add whatever is obvious for you: source order, customer, quantity, attached drawing.
- Set the owner of each stage. Cutting belongs to the saw operator, assembly to the line lead, check to whoever signs off the shipment. Use roles and groups in People so this does not hang on a single name.
- Write the procedure in Documents. What has to be ready before an order leaves each stage. It sits next to the tasks, and every version keeps who wrote it.
On the board, the order moves through Backlog, To do, In progress, Blocked, Review and Done. If material is missing, the card goes to Blocked and shows why. Anyone who opens the board sees the stage and the owner without asking the group.
Where the agent comes in
The agent follows the orders and shows each one at its current stage and who has it. When a stage is finished, it proposes the next step: move the order, hand it to the owner of the next stage, flag it when the due date is close and the order is still in cutting.
You give it a written instruction in plain language:
Follow the production orders. When check approves an order, propose moving it to Shipping and assigning it to the shipping owner. If an order is two days from its due date and still in cutting or assembly, post a project update with the order, the stage and the owner. Never change the due date.
To do this it calls tools such as tasks_search to find orders, tasks_get to read a card, tasks_transition to change the stage, tasks_assign to change the owner and project_updates_publish to tell the team.
By default, the agent proposes and a person clicks Approve or Decline. It also reaches only what you allow it in the system: it can read and move production orders without seeing the sales pipeline, for example.
What gets recorded
Every change goes into the history with a name and a date. When the agent made the change, the entry carries the "agent" badge and shows who approved it. If an order ran late, you can see which stage it stalled at, since when, and who had it. No digging through the WhatsApp thread.
With the AI you already use
If your company already uses ChatGPT, Claude, Gemini or another assistant, you can connect it to Uranus OS through the MCP server. Then you ask which orders are stuck in assembly and move the cards from there, with the same permissions and the same history.
If you would rather not set it up yourself, Uranus can do the rollout with your team.
Uranus OS is in closed beta. Join the closed beta and set up your first order with the people on the shop floor.